Groundbreaking for automatic warehousing system

On 05.06.2015 the groundbreaking ceremony for a new investment took place in the Schierle Stahlrohre KG. Until the end of 2015, a high-bay warehouse of the Swiss manufacturer Fehr is built on the site in Neuss. In the future cylinder tubes, chrome plated bars, piston tubes and hydraulic pipelines are to be stored for up to a length of 8.1 m and 300 mm outer diameter in the system. The HRA has capacity for 2500 cartridge to a maximum weight of 3 tons and will contribute significantly to speed up and optimize the processes in operation.

 

Read by clicking the following link to an article published in the MaschinenMarkt:

Groundbreaking for an automatic warehouse system at Schierle

This website uses cookies, which are necessary for the technical operation of the website and are always set. Other cookies, which increase the usability of this website, serve for direct advertising or simplify interaction with other websites and social networks, will only be used with your consent.

Privacy Policy